The mayor of Rustavi familiarized herself with the process of rehabilitation of residential buildings, in Donetsk metalurgta street N18 a, Kashakashvili street N8 and N10. Nino Latsabidze also met the local residents and talked about the current and planned projects in the city.
Within the framework of ongoing works in Donetsk Metallurgta street N18, Kashakashvili Street N8 and N10, structural strengthening of load-bearing walls of buildings, renovation of facades and wall cladding will take place. Similar works are being carried out in N4 of the 2nd exit of Vazha-Pshavela and N7 of the third alley of Todria, while balconies are being rehabilitated in N15 of Kostava.
Within the framework of the restoration project of the historical part of Old Rustavi, strengthening and rehabilitation of buildings is underway in the residential buildings of Rustaveli Street N 11, 15, 17, 19, 20, 22, 24, 26, 28, Batumi Street N14 and Aslanikashvili Street N12. In Rustavi, the total cost of ongoing infrastructure works at 17 addresses is 6.5 million GEL