The new road infrastructure is being built on another street in Rustavi. On the road between the 7th and 8th microdistricts, the first layer of asphalt pavement was laid.
The project envisages the arrangement of road infrastructure in three places. At the same time, works are being carried out on the streets of Abkhazeti and Lomouri.
The cost of the project is up to GEL 4 million.